DISASTER RECOVERY UPDATE

OUTAGE RESOLVED

73h 43m downtime has been resolved after diagnosing the following symptoms found on the OmniDyne Cincinnati Site Server [NODE 3b UNIX]:

  • CRON Disaster Recovery did not properly fire, failsafe mode did not trip at 00:30 due to a misprint in the script. This misprint has since been fixed.
  • Power Failure to Processor. A more robust power delivery has been established.
  • Network Failover did not trigger due to previous two issues. This was due to a new network configuration being introduced but not hardwired in Cron. Secondary Network Failover has been introduced.

Further issues brought forth when entering DR at the Cincinnati Site:

  • Waste has not been properly disposed in several months. Introducing additional remediation efforts to staff to provide incentive.
  • Neural Dial-Up Link seems to be producing anomalies in code since entering DR. Rolling back to non-DR state did not reverse these anomalies. Unsure of affects going forward, no backups of previous codes exist, and current code is load bearing as-is.

Images of current workstation state are attached below. You may notice electrical output has been cut upon vacating the premises.

[END TRANSMISSION]

Ben Seitz Scarlet Street // Cincinnati Office